Temps de séchage de la peinture du bâtiment (surface sèche) comment détecter?

Tester le temps de séchage des revêtements architecturaux (séchage superficiel) is to assess the drying speed and degree of paint in the process of construction, afin de déterminer son champ d'application et la qualité de sa construction. Si le temps de séchage du revêtement est trop long ou trop court, it will affect the aesthetic and protective performance of the coating surface, so the drying time detection is needed to ensure the quality of construction. En même temps, the subsequent coating construction before the coating surface is completely dried will also affect the adhesion and durability of the coating.

Temps de séchage de la peinture du bâtiment (surface sèche) comment détecter? Picture 1

Temps de séchage de la peinture du bâtiment (surface sèche) comment détecter?

Méthode de détection
Le temps de séchage (séchage superficiel) of architectural coatings is an index to evaluate its drying speed and degree in the process of construction. Voici les méthodes et étapes de test pour le temps de séchage des revêtements architecturaux:

La préparation des échantillons: coating evenly on the sample to ensure uniform coating thickness, after drying, cut into samples of appropriate size.

Drying time test: record the drying condition of the coating within the specified time after construction, observe the state of the sample surface, such as surface dry, hard dry, and drying time.

Follow-up construction test: According to the suggestions of the coating manufacturer, observe the state of the sample before and after surface drying to evaluate the follow-up construction performance and the adhesion and durability of the coating during the construction process.

Traitement de l'information: By observing the data obtained from the tests, the drying time of the coatings is assessed, and the rating of the coatings is determined, usually according to relevant criteria, pour déterminer si les revêtements répondent aux exigences de l'application.

Temps de séchage de la peinture du bâtiment (surface sèche) comment détecter?

Nous vous rappelons: different types of paint in the drying time performance is different, donc, in the actual detection, should be based on different paint types and application scenarios, the use of different detection methods and standards, in order to evaluate the drying speed and degree of paint in the construction process.

In a word, the detection of drying time of architectural coatings is an indispensable work in architectural engineering. Grâce à des méthodes et étapes de détection raisonnables, you can evaluate the drying speed and drying degree of paint in the construction process, choose the appropriate type and brand of paint, so as to ensure the construction quality and service life of the building.

Partager cette publication